Resume Oleg
no image
Resume Oleg

Objective:
To obtain a position Mechanical Engineer (Project Designer), AutoCAD Engineer, Construction Inspector in the fields of Industrial Construction, Energy.

Summary
• About fifteen years of experience with thermal, mechanical and electrical equipment (for steam, water, gas fuel, diesel fuel, air, plumbing, HVAC), technical design and working project documentation (working drawings), construction project budget and construction inspection in the field of construction and renovation of Power plants.
• Knowledge of Steam Generation power plant equipment including boiler, turbine, generator
• Admit my mistakes.
• More than six years of management experience.
• Proficient with MS Office, Windows, AutoCAD Mechanical/Civil 2017, Prime Expert, Primavera and the Internet, Adobe Acrobat
• English: level A2-B1 (Pre-Intermediate – Intermediate)

Education:
• Certificate AutoCAD Designer
Training center “AutoCAD Classes Miami” ------------/

• Mechanical Engineer (Heating Engineer) of thermal and mechanical equipment of thermal power plants
National Research University "Moscow Power Engineering Institute" (MPEI), 2010
http://mpei.ru/lang/en/Pages/default.aspx

• Economist in the field of Energy
Moscow State Open University, 2002.

• Mechanical Engineer.
Orenburg State University, 1999.

Freelancer

Work Experience
march 2018 – to present - Freelancer

TEK Mosenergo (The Customer of construction of TPP), Moscow, http://tekmosenergo.ru/en/
nov.2015 – feb 2018
Position: Senior Mechanical Engineer

• design, drafting (AutoCAD) and analyze technical design and working project documentation (detailed drawings and schematics, prepares system layout, specifications, installation drawing, construction drawing, P&ID, different mechanical, electrical and technological systems with equipment such as: water distribution systems; natural gas distribution systems include GTU, high pressure gas compressor and Unit gas conditioning station; fire protection design; drainage systems; cooling systems include cooling towers and dry cooling towers with pumps and valves; chillers; HVAC; heating systems and steam systems include steam turbines, boilers and heat exchangers, regulation and bypass valves, valve with pilot operated; pipelines; HVAC; plumbing; etc) for the construction of power plants in Russia (Krasnodar CCGT-TPP, Yamal CCGT-TPP);
• analyze technical proposals (offers) on delivery of mechanical equipment for thermal power plants (pumps, valves (regulation and bypass valves, valve with pilot operated and other), cooling tower, pipelines, HVAC, plumbing, fire protection design, natural gas distribution systems, water distribution systems);
• analyze technical documentation for equipment from Manufacturers (P&ID, technical data sheets, manuals, installation documentation, etc. documentation);
• identified and corrected over five major design errors in the working project documentation;
• identified over ten major design errors in the Technical documentation of equipment from Manufacturers (deviations from the required parameters, deviations from the sets of equipment, proposed wrong materials of the equipment, etc.);
• proposed and implemented of over four technical solutions for optimization working project documentation (in the fire protection system, cooling system, fuel supply system);
• inspection of the mechanical components of Power plants and boiler houses construction;
• participated in various technical meetings with the Customers and Designers (Project Organization), Construction and installation Companies, Suppliers and Manufacturers of equipment;
• participation in shaping (forming) of procurement plan of mechanical equipment and construction schedule of TPP, prepares bid tabulations on complex purchases;
• preparation of budget of the power plant construction;
• participation in inspections of plants (factories) making equipment;
• participation in the testing of mechanical equipment;
• developed a small program (on the basis of Excel) to check equipment and hydraulic losses in pipelines.

E4 Group JSC (The Customer and General contractor for the construction of TPP), Moscow, http://www.e4group.ru/en/
aug.2010 – march 2015
Position: Senior Mechanical Engineer. Chief of technological division.

• The management of technological division;
• Inspected of the mechanical components of Power plants and boiler houses construction;
• inspected operating mechanical and heat equipment of the Power Plant, Boiler houses, heat supply systems; made technical reports (about) on the actual condition of the mechanical equipment;
• analyzed technical proposals (offers) on delivery of mechanical equipment for thermal power plants (pumps, valves (regulation and bypass valves, valve with pilot operated and other), Air compressor, high pressure gas compressor, cooling tower, pipelines, equipment of HVAC, plumbing, fire protection design, etc);
• analyzed technical documentation for equipment from Manufacturers (detailed drawings and schematics, P&ID, technical data sheets, manuals, installation documentation, etc. documentation);
• calculated parameters of the mechanical equipment (for pumps, valves, heat exchangers, pipelines, drying cooling towers, HVAC systems);
• participation in shaping (forming) of procurement plan of mechanical equipment and construction schedule of TPP, prepares bid tabulations on complex purchases;
• preparation of budget of the power plant construction;
• participated in various technical meetings with the Customers and Designers (Project Organization), Construction and installation Companies, Suppliers and Manufacturers of equipment;
• participation in inspections of plants (factories) producing equipment;
• participation in the testing of mechanical equipment;
• identified and corrected over ten major design errors in the working project documentation;
• identified over twenty major design errors in the Technical documentation of Manufacturers for equipment (deviations from the required parameters, deviations from the sets of equipment, proposed wrong materials of the equipment, etc.);
• proposed and implemented of over ten technical solutions for optimization working project documentation (in the fire protection system, cooling system, fuel supply system) resulting in savings of $1.5 million;
• developed technical specifications for the manufacture of thermal mechanical equipment
• perform engineering studies to evaluate customer needs and develop alternative solutions that will be technically sound and economically feasible.

Moscow Integrated Power Company JSC (The Customer of construction of TPP), Moscow, http://www.moek.ru/ru/
march 2009 – aug.2010
Position: Chief of technological division of construction and reconstruction.

• inspected operating mechanical and heat equipment of the Power Plant, Boiler houses, heat supply systems; made technical reports (about) on the actual condition of the mechanical equipment;
• analyzed technical design and working project documentation (working drawings) of the General designer for the construction and reconstruction of power plants and thermal power station in Moscow (Strogino CCGT-TPP, Rublevskaya TPS);
• analyzed technical documentation for equipment from Manufacturers (P&ID, technical data sheets, manuals, installation documentation, etc. documentation);
• participation in shaping (forming) of procurement plan of mechanical equipment and construction schedule of TPP;
• participation in the testing of mechanical equipment

All-Russia Thermal Engineering Institute (Design Institute.), Moscow, http://vti.ru/en/
march 2003 – dec.2008
Position: Mechanical Engineer.
• The management and coordination of technical design and working project works for the construction of power plants in Russia (Combined cycle gas turbine unit, A steam turbine thermal power plant);
• calculated parameters of thermal mechanical equipment;
• developed technical specifications of thermal mechanical equipment for the manufacture;
• participation in design (drafting) of technical design and working project works (AutoCAD);
• design, drafting (AutoCAD) and analyze technical design and working project documentation (detailed drawings and schematics, prepares system layout, specifications, installation drawing, construction drawing, different mechanical and technological systems with equipment such as: water distribution systems; natural gas distribution systems include GTU, high pressure gas compressor and Unit gas conditioning station; fire protection design; drainage systems; cooling systems include cooling towers and dry cooling towers with pumps and valves; chillers; heating systems and steam systems include steam turbines, boilers and heat exchangers, regulation and bypass valves, valve with pilot operated; pipelines; HVAC; plumbing; etc);
• calculated variable costs and fixed operating costs, calculated investment cost;
• calculated economic efficiency for construction of power plants.
• inspected operating mechanical and heat equipment of the Power Plant, Boiler houses, heat supply systems; made technical reports (about) on the actual condition of the mechanical equipment

Honors:
• Recognized as the best specialist company (three times)
• Graduated Magna Cum Laude with a GPA of 4.8 on a 5.0 scale

Interests
• My Family, Gymnastic exercises, Jogging, Reading.